EUDR · FAQ

EUDR FAQ: 25 questions exporters and EU importers ask most

Short, plain answers on who must comply, the deadlines, country risk, plot geolocation and GeoJSON, filing a Due Diligence Statement in TRACES, and what it means for rubber, coffee and soy. Each section links to our full guide.

Book a demo →Check your plots free

Answers reflect the EUDR as amended by Regulation (EU) 2025/2650 and the Commission's 2026 implementing measures, as at November 2026. General information, not legal advice.

Scope and deadlines

What is the EUDR?

The EU Deforestation Regulation, Regulation (EU) 2023/1115. It requires that cattle, cocoa, coffee, oil palm, rubber, soya and wood, and products made from them, are deforestation-free, legally produced and covered by a Due Diligence Statement before they are placed on the EU market or exported from it.

When does the EUDR apply?

From 30 December 2026 for large and medium operators and traders, and from 30 June 2027 for micro and small operators, unless they were already covered by the EU Timber Regulation.

What is the deforestation cutoff date?

31 December 2020. Land converted from forest after that date cannot supply the EU market, even if the conversion was legal.

Which products are covered?

The products and HS codes listed in Annex I. The July 2026 scope update added products such as soluble coffee and certain palm oil derivatives from 30 December 2027, and removed others, including retreaded tyres, cattle hides and leather, and soybeans for sowing.

Who has to file a Due Diligence Statement?

Operators who first place a relevant product on the EU market or export it: EU importers, EU producers and exporters from the EU. Since Regulation (EU) 2025/2650, downstream operators and traders no longer file their own statements but must keep the upstream reference numbers for five years.

Do exporters outside the EU have to file?

Usually not. An exporter in India, Vietnam or Côte d'Ivoire normally supplies plot data and legality evidence to its EU buyer, who files the statement. Without that data the buyer cannot file.

Read the 30 December 2026 checklist →

Country risk

How does EUDR country benchmarking work?

Implementing Regulation (EU) 2025/1093 puts every country into one of three tiers. Four countries are high risk (Belarus, Myanmar, North Korea and Russia), a named list is low risk, and every other country is standard risk.

Is India low risk under the EUDR?

Yes. India is on the low-risk list, along with countries such as Vietnam, Sri Lanka, Ghana, the United States, China and the EU Member States.

Does low risk mean less work?

Less, but not none. Operators sourcing only from low-risk countries can use simplified due diligence and skip the risk assessment and mitigation steps, but they still need plot geolocation, legality evidence and a Due Diligence Statement for every shipment.

How often do authorities check operators?

Competent authorities must check at least 1% of operators for low-risk origins, 3% for standard risk and 9% for high risk.

Read the country risk guide →

Plot geolocation and GeoJSON

What geolocation does the EUDR require?

The latitude and longitude of every plot that produced the commodity, with at least six decimal digits. Plots over 4 hectares, for commodities other than cattle, must be described as a polygon of the real boundary.

Do plots under 4 hectares need a polygon?

No. Plots of 4 hectares or less can be a single point with the plot area. A polygon is always allowed and gives a stronger deforestation check.

What file format does the EU Information System accept?

GeoJSON in WGS 84 (EPSG:4326), with coordinates in [longitude, latitude] order and six decimal places. Point, MultiPoint, Polygon and MultiPolygon geometries are accepted; lines are rejected. A statement can carry up to 25 MB of geolocation.

What are the most common GeoJSON errors?

Swapped latitude and longitude, self-intersecting polygons, open rings, holes inside polygons, plots over 4 hectares submitted as points, points without an area, coordinates in UTM or a national grid, and KML or shapefiles uploaded instead of GeoJSON.

How can I check a plot file before filing?

Upload it to the free TRST01 EUDR Polygon Validator. It flags geometry errors, converts KML and shapefiles, and screens each plot for protected-forest overlap and deforestation risk against the 31 December 2020 cutoff. New accounts start with 500 free credits.

Read the GeoJSON requirements guide →

Filing a Due Diligence Statement

What do I need before filing a DDS in TRACES?

An EU Login for each filer, your EORI number for imports or exports, the HS code, description and net mass of each product line, the country of production, validated plot geolocation, and completed due diligence.

Can a Due Diligence Statement be changed after submission?

Yes, for 72 hours after it becomes AVAILABLE, unless it is locked, for example because the goods have been placed on the market, the reference number has been sent to customs, or a check has been announced.

What happens to the DDS reference number?

For imports and exports it goes on the customs declaration, and it is passed to the buyer. The first downstream operator must keep it.

How long must EUDR records be kept?

Five years, in a form that can be retrieved for an audit.

Can statements be filed in bulk?

Yes. The EU Information System has an API for bulk submission. Tools such as TRST01's EUDR Hub onboard suppliers, validate polygons and file statements to TRACES without keying each one in by hand.

Read the step-by-step TRACES guide →

Rubber, coffee and soy

How is India making natural rubber EUDR-ready?

Through the Rubber Board of India's national BSNR programme, built on TRST01Chain, which maps smallholder rubber plots and links them to the lots that reach tyre makers and EU buyers.

Is instant coffee covered by the EUDR?

Soluble coffee was added to the scope by the July 2026 update and applies from 30 December 2027, one year after the main application date.

Does shade-grown coffee trigger deforestation alerts?

It can. Pruning or replanting shade trees can show up as tree-cover loss on satellite data, so each alert should be reviewed against the 31 December 2020 baseline before a compliant farm is excluded.

Are soybean meal and soy oil covered?

Yes. Soybeans, soybean meal and soy oil are relevant products, so EU buyers need plot geolocation and a Due Diligence Statement for them, whatever the country of origin.

Can blended lots still be traced to the plot?

Yes, if purchases are recorded against the farmer and plot at the first point of collection. Blended lots then keep their full list of source plots through processing, and one GeoJSON file can be produced for each shipment.

See TRST01's EUDR compliance platform →